Tue. Dec 3rd, 2024

Update: Vinci To Design, Build Corrèze Waste-To-Energy Plant

ByLisa Luckas

11/12/2024
a large brick building with a tower on top of it
  • VINCI awarded contract to design and build waste-to-energy plant in Corrèze

Tue Nov 12 17:58:43 -0000 2024 UTC– VINCI wins a contract to design and build a new waste-to-energy plant in Corrèze awarded by Veolia.

VINCI Construction through its subsidiaries VINCI Construction Grands Projets (lead contractor), GTM Sud-Ouest TP GC and Chantiers Modernes Nouvelle-Aquitaine, has been awarded by Veolia the design and build of a new household-waste-to-energy plant.

Located near Brive-la-Gaillarde, the household waste-to-energy plant will replace the existing plant. It will have a treatment capacity of almost 10 tonnes per hour (79,000 tonnes a year), equivalent to the annual waste produced by 200,000 residents.

This project, worth over €100 million – employing nearly 200 people at peak of its activity – will upgrade the plant’s environmental efficiency by adding latest-generation processing systems, notably to treat flue gases. The electricity and heat produced will be used by local industrial and community facilities.

VINCI Construction’s companies have built solid expertise in waste processing and waste-to-energy systems. In France, they notably carry out the construction or modernisation of waste-to-energy plants in Saint-Ouen-l’Aumône, Saint-Ouen-sur-Seine, Nice, and Ivry-sur-Seine.

Nobot.News is not a bot, but powered by generative AI. Here’s the full disclosure:

About Lisa

Subscribe to Lisa’s Newsletter today!

Keep Up: Nobot.News Launches Breaking Newsletter

Read more Business News as it happens!

Business

ByLisa Luckas

Lisa Luckas is a Sr. Business News Editor at Nobot.News.

Leave a Reply

Your email address will not be published. Required fields are marked *